Saturday 28 June 2014

Which of the following violates a SmartBuild best practice regarding flow design?

A. An Assignment with three Connector Flow Actions and four Local Flow Actions
B. A flow that calls more than two sub flows
C. A flow with four utility shapes linked together
D. A flow that spans multiple Visio pages

Ans: D


1 comment: